MITS5001 IT Project Management Case Study and Presentation

MITS5001
IT Project Management
Case Study and Presentation
Case Study and Presentation (Individual Assignment) – 10% (Due week 5, Sunday 11:55pm) Objective(s)
This assessment relates to the unit learning outcomes as in the unit descriptor. This assessment is designed
to evaluate student’s ability to identify the key phases of projects and to successfully manage the projects
by using various IT project management tools and techniques.
The following ULOs are assessed in this assessment.
LO1 Demonstrate ability to skilfully manage projects by putting to effective use various IT project
management tools and techniques.
LO2 Critically analyse project parameters and identify the key processes from the available project
management book of knowledge in practical case scenarios.
INSTRUCTIONS
In this assignment you will use the IT project management knowledge area and the tools used in project
initiation and planning to prepare a project charter for the Case Study below. Make sure to analyse the
project management parameters and identify the actors relevant to the case study and mention the project
scope, constraints and assumptions.
For this assessment, you will prepare a project charter based on the business case given below. Your report
should be limited to approx. 1000 words. Use 1.5 spacing with a 12 point Times New Roman font. You
3/26/2020 [In Process] 54017 – MITS5001IT Project ManagementCase Study
https://www.australiabesttutors.com/Recent_Question/54017/MITS5001IT-Project-ManagementCase-Study-and-PresentationCase 3/6
can use other sources to support your claims. Citation of sources is mandatory and must be in the IEEE
style.
The project charter must include:
• Project Title.
• Background (Why is the project is undertaken? Describe an opportunity or problem that the project is to
address.)
• Project Goal/s (Not more than 3)
• Project Scope (What will be the end result of the project?)
• Key Stakeholders
• Project Milestones (Identify/assume the significant project milestones)
• Constraints and Assumptions
Submission Guidelines:
All submissions are to be submitted through turn-it-in. Drop-boxes linked to turn-it-in will be set up in the
Unit of Study Moodle account. Assignments not submitted through these drop-boxes will not be
considered. Submissions must be made by the due date and time (which will be in the session detailed
above) and determined by your Unit coordinator. Submissions made after the due date and time will be
penalized at the rate of 10% per day (including weekend days).
The turn-it-in similarity score will be used in determining the level if any of plagiarism. Turn-it-in will
check conference websites, Journal articles, the Web and your own class member submissions for
plagiarism. You can see your turn-it-in similarity score when you submit your assignment to the
appropriate drop-box. If this is a concern you will have a chance to change your assignment and resubmit.
However, re-submission is only allowed prior to the submission due date and time.
After the due date and time have elapsed you cannot make re-submissions and you will have to live with
the similarity score as there will be no chance for changing. Thus, plan early and submit early to take
advantage of this feature. You can make multiple submissions, but please remember we only see the last
submission, and the date and time you submitted will be taken from that submission.
SIGMA Consulting’s Business Case:
Introduction/Background
SIGMA Consulting’s core business goal is to provide world-class project management consulting services
to various organizations. The CEO, Joe Fleming, believes the firm can streamline operations and increase
business by providing information related to project management on its intranet site, making some
information and services accessible to current and potential clients.
Business Objective
SIGMA Consulting’s strategic goals include continuing growth and profitability. The Project Management
Intranet Site Project will support these goals by increasing visibility of the firm’s expertise to current and
potential clients by allowing client and public access to some sections of the intranet. It will also improve
profitability by reducing internal costs by providing standard tools, techniques, templates, and project
management knowledge to all internal consultants. Since SIGMA Consulting focuses on identifying
profitable projects and measuring their value after completion, this project must meet those criteria.
Current Situation and Problem/Opportunity Statement
SIGMA Consulting has a corporate Web site as well as an intranet. The firm currently uses the Web site
for marketing information. The primary use of the intranet is for human resource information, such as
where consultants enter their hours on various projects, change and view their benefits information, access
an online directory and Web-based e-mail system, and so on. The firm also uses an enterprisewide project
management system to track all project information, focusing on the status of deliverables and meeting
scope, time, and cost goals. There is an opportunity to provide a new section on the intranet dedicated to
sharing consultants project management knowledge across the organization. SIGMA Consulting only hires
experienced consultants and gives them freedom to manage projects as they see fit. However, as the
business grows and projects become more complex, even experienced project managers are looking for
suggestions on how to work more effectively.
3/26/2020 [In Process] 54017 – MITS5001IT Project ManagementCase Study
https://www.australiabesttutors.com/Recent_Question/54017/MITS5001IT-Project-ManagementCase-Study-and-PresentationCase 4/6
Critical Assumption and Constraints
The proposed intranet site must be a valuable asset for SIGMA Consulting. Current consultants and clients
must actively support the project, and it must pay for itself within one year by reducing internal operating
costs and generating new business. The Project Management Office manager must lead the effort, and the
project team must include participants from several parts of the company, as well as current client
organizations. The new system must run on existing hardware and software, and it should require minimal
technical support. It must be easily accessible by consultants and clients and be secure from unauthorized
users.
Analysis of Options and Recommendation
There are three options for addressing this opportunity:
1. Do nothing. The business is doing well, and we can continue to operate without this new project.
2. Purchase access to specialized software to support this new capability with little in-house development.
3. Design and implement the new intranet capabilities in-house using mostly existing hardware and
software.
Based on discussions with stakeholders, we believe that option 2 is the best option.
Marking Guide: 50 Marks
Task Description Marks
Background Describe why the project is undertaken. Students need to mention an opportunity or problem
that the project is to address. 08
Project Goal State maximum three goal/s of the project. 06
Project Scope Describe the end result of the project. 10
Key Stakeholders List all the individuals who are related to the project. 05
Project Milestones Identify or assume the significant events to complete the project. 06
Constraints Identify and mention anything that restricts or dictates the actions related to the project. 08
Assumptions State the factors that is considered to be true, real or certain often without any proof or